The folder 3 meets today's requirements: comfortable, safe and high -quality.
If you do not have enough space in the attic, then this compact attic staircase is the ideal solution.
Thanks to the pick -up mechanism, equipped with a special spring system, both the trap and the attic staircase is perfectly balanced. This ensures a maximum safety when opening.
Description folder 3 attic staircase
- three -piece fold
- Measurement stair width: 42 to 45 cm (according to opening width)
- depth steps: 11 cm
- Staircase trees: 12 cm
- 2 metal handrails
- Protection feet in rubber
- The steps have been gone and attached to the trees
- 1e Choice R.N.D-Wood colored with an insect resistant product
Ideal opening sizes for an attic staircase:
Length: 1.40m
Width: 0.80m
Size chart (see sketch)
Maximum height bottom ceiling
|
Minimum length of the opening
|
2.45m
|
1.25m
|
2.50m
|
1.30m
|
2.55m
|
1.35m
|
2.60m
|
1.40m
|
2.65m
|
1.45m
|
2.70 m - 3.10m
|
1.50m
|
Trapdoor:
- Plywood of 22 mm with frames above and below
- Equipped with a draft strip
- Sturdy hinges and a lock
Iron batter:
- Extra strong feathers offer maximum safety when opening and closing the traps.
*General terms and conditions price including placement:
- The specified price includes 21%VAT
- For buildings older than 5 years, with a maximum living area of 200m², any owner-occupied home of the client / copper and mainly as a private home are used, the VAT rate of 6% applies.
- The price stated is up to a total vertical height bottom ceiling 3.10m.
- When ordering an attic staircase, an appointment will be made to measure the opening sizes. If this is not within the maximum measurements, an additional price will be charged, see options.
- The placement is included on condition that the location is located within a 35km radius around our company. If further, an additional price will be charged.
- A quote will always be offered. This must be confirmed for approval before the stairs are taken in order.
- This is tailor -made and therefore not in stock as standard.
- Implementation period: +/- 3 to 4 weeks after measurement/confirmation quotation.
Download here The measurement form.